PROJECT PORTFOLIO

The following is a listing of a selection of projects that ACW has completed satisfactorily.

Project Name:
Hill Top Residence


Location:
Talet El-Khayat residential area lot # 1510, Beirut, Lebanon

Client:
جمعية المقاصد الخيرية الإسلامية – M. Ghanem & Abd Ellatif Chamma’ah

Consultant:
Spectrum Engineering Consultants

Project Group:
Turn Key, Luxurious Residential & Commercial Complex

Type of Works:
Major Excavation and Shoring Works, Reinforced Concrete structure, Wood Works, Steel Works, HVAC, Plumbing, electrical, conveying systems, general finishes including paint, tiles, cladding, etc...

Description of Project:
A luxurious residential complex composed of six residential blocks, 11 stories each with one apartment per floor, underground parking and amenities, external landscaping, and & a modern design commercial centre, with a total of 63,000 m2 of built-up area


Estimated value of Works:
$ 55,000,000. US

Duration of project:
3 years

Work is under execution






Project Name:
Nova Towers


Location:
Mme Curie Street, Koreitem on Lots 1068 & 1069, Beirut, Lebanon

Client:
Mohammad Ghanem El Chamma'ah - Shatilla Family

Consultant:
Spectrum Engineering Consultants

Project Group:
Luxurious Residential Building

Type of Works:
Minor excavation, demolition, concrete works, masonry, stone cladding, Plumbing, heating ventilation, and Air conditioning, Tiling, false ceiling and general finishes.

Description of Project:
Unique independent Twin Towers consisting of; A ground floor, 22 stories, and five underground basements for car parks, technical rooms, and amenities.


Duration of the Project:
24 months Works Started on December 2006, Expected Date of Handing over December 2009.

Work is under execution






Project Name:
Vega Residence


Location:
Old Ain Mreisseh Street, on Lot 364, Beirut, Lebanon

Client:
Mohammad Ghanem El Chamma'ah - Moumneh Family

Consultant:
Spectrum Engineering Consultants

Project Group:
Luxurious Residential Building

Description of Project:
Unique building consisting of; A ground floor, 13 stories, and two underground basements for car parks, technical rooms, and amenities.

Duration of the Project:
24 months Works Started on December 2006, Expected Date of Handing over December 2009.

Work is under execution





Project Name:
Traffic Management Centre - TMC


Location:
Dora District, Nahr Street, Beirut, Lebanon

Client:
Council for Development & Reconstruction

Consultant:
Team-IDE

Project Group:
New Building - Governmental Building

Type of Works:
Minor excavation, demolition, concrete works, masonry, stone cladding, Plumbing, heating ventilation, and Air conditioning, Tiling, false ceiling and general finishes.

Description of Project:
Five Story Building for offices and control rooms including auditorium and one basement for car park, to accommodate the control centre of all traffic management systems in Beirut.

Work undertaken by the Co.:
Minor excavation, demolition, concrete works, masonry, stone cladding, Plumbing, heating ventilation, and Air conditioning, Tiling, false ceiling and general finishes.

Duration of the Project:
18 months Works Started May 2006, Expected date of Handing over November 2007.
(Project Currently under execution)


Value of Company Work:
Approximately $ 5,000,000 US (Five Million US Dollars)







Project Name:
Baalchmieh Private Residence


Location:
Baalchmieh, Lebanon

Client:
Abdel Rahman Al Shaye

Consultant:
Al Diar - IDEP

Project Group:
Restoration and New Building

Type of Works:
Restoration, excavation, demolition, concrete works, masonry, stone cladding, Plumbing, heating ventilation, and Air conditioning, Tiling, false ceiling and general finishes, swimming pool, and Landscaping.

Description of Project:
Demolition of areas in the old building, restoration of the old building, and the construction of an annex villa, gymnasium, swimming pool, retaining walls, fence, boiler room, and landscaping.

Works Undertaken by Company:
Minor excavation, demolition, concrete works, masonry, stone cladding, Tiling, false ceiling and general finishes. Managing and coordinating plumbing, heating ventilation, and Air conditioning,

Duration of the Project:
24 months Works Started July 2005, Expected date of Handing over July 2007.

Value of Company Works
Approximately $ 3,500,000 US (Three Million Five Hundred Thousand US Dollars)





Project Name:
Beirut Arab University Debbieh Complex

Location:
Debbieh – Lebanon

Client:
Beirut Arab University

Consultant:
Said El – Jazairi & Partners, Beirut
(Tel:01-345128)

Type of Building Project:
Educational Complex

Type of Works:
Reinforced Concrete/ Precast concrete/ Structural steel works/ Mechanical Works/ Heating, ventilation air conditioning / Electrical works/ Façade works, special finishing/ Earth Works, landscaping / External works (asphalting)

Description of Project:
Complex Consisting of 2 teaching buildings, One administration, and 3 teachers and students housing buildings. Total build up area is approximately 27,000m2.

Work undertaken by the Co.:
Works included earthworks, reinforced concrete, precast prestressed concrete, structural steel, water supply & irrigation, masonry 7 plastering, doors & windows.

Duration of the Project:
Start February 2003- under construction (24 months)

Value of Company Work:
US $ 7,500,000 as Main Contractor.








Project Name:
Park Avenue – LONA 1


Location:
Beirut Central District (Solidere) - Lebanon

Client:
Confidential Client.

Consultant:
Al DIAR

Project Group:
New Building

Type of Works:
Excavation, Waterproofing, demolition, & concrete works.

Description of Project:
Private Residence.

Work undertaken by the Co.:
Excavation, Waterproofing, & concrete works.

Duration of the Project:
15 months Works Started July 2005, Date of Handing over September 2006.


Value of Company Work:
Approximately $ 1,500,000 US (One Million Five Hundred Thousand US Dollars)

Work is completed



Project Name:
Naccache – Rabieh and Dick El Mehdi Interchanges


Location:
Rabieh – Metn

Client:
Council for Development & Reconstruction (CDR)

Consultant:
ETEC, Clemencau, Beirut

Project Group:
General Road Works: 4 lane road

Type of Works:
Earthworks / Asphalt works / Concrete bridges / Utilities and services / Road markings and street furniture / Side walks & curbstones works.

Description of Project:
The project consists of an underground 4 lane road tunnel of approximately 210 m long and includes 800 m of retaining walls.

Work undertaken by the Co.:
The works involved excavation in firm rock formation, retaining walls, underground utilities, box section tunnel (2 way) in reinforced concrete, asphalt works and road marking.

Duration of the Project:
Start December 1999 and end November 2000
(11 Months)


Value of Company Work:
US $ 3,750,000 as Main Contractor

Work is under execution





Project Name:
Metropolitan City Center Excavation & Shoring Works

Location:
Beirut – Lebanon

Client:
Al- Habtoor Properties (Jamhour, Tel: 05-920950)

Consultant:
Conser Consulting Engineers (Beirut, Tel:01- 737825

Project Group: General Civil Works: Excavation & Shoring Works.

Type of Works:
General Works/ Anchorage works/ Shotcreting Works

Description of Project:
Excavation works consist of 400,000m3 with depth of 28m, 4,000m of Piles up to 32m deep, 26,000m of Anchors up to 26m long

Work undertaken by the Co.:
Excavation & carting away of material carting away drilling piles, executing Rows of Anchors, Shotcreting of Excavation face under neighbouring building and reads.

Duration of the Project:
Start August 2002 and end July 2003 (11 month)

Value of Company Work:
US $ 3,750,000 as Main Contractor



Project Name:
Traffic Management of Saida Eastern Boulevard

Location:
Saida

Client:
Council for Development and Reconstruction (CDR)

Consultant:
Dar Al Handasah- Shair and Partners.

Project Group:
Road Works

Type of Works:
Earth Works, Sub- base and Base Course, Bituminous Pavement, Reinforced Concrete and Steel Structure, Incidental Construction, street Lighting and Electrical Installations, Landscaping and Irrigation

Description of Project:
The works comprises the constructions and completion of 1km dual carriage- way parallel to the eastern boulevard in Saida, inside railway premise and between Sabbagh and Al- Murjan intersect Each carriage way consists of 1 Lane (3.5m) per direction and 1m shoulder. Also the project includes the upgrading of traffic flow at Eliya and Al – Arabi Intersections.

Work undertaken by the Co.:
The works involved excavation, Sub base and base course, Bituminous construction concrete protection for Electrical substation, curbstone, Side Walk, Road Signs, Road Marking, Traffic signals, Landscaping and Irrigation, and all other related works necessary for the completion of the project.

Duration of the Project:
6 Months


Value of Company Work:
$ 732,800


Project Name:
Imam El Ousaii Islamic University

Location:
Saida – Lebanon

Client:
Bir Wal Ihsan Entailment

Consultant:
Said Jazairi

Type of Building Project:
Buildings

Type of Works:
Reinforced Concrete 12,000 m3, Escavation 25,000m3

Description of Project:
Construction of one University Building and A Mosque Overall approximately 15,000m2.

Work undertaken by the Co.:
Excavation works and Reinforced Concrete

Duration of the Project:
Start October 2003 till 2004

Value of Company Work:
US $ 1,600,00 as Main Contractor.

 

Project Name:
Martyrs Mosque

Location:
Saida – Lebanon

Client:
Confidential Client
Consultant:
Amin Bizri Architect

Type of Building Project:
Buildings

Type of Works:
Reinforced Concrete/ Precast prestressed, plumbing, HVAC, Electrical, External lighting, Landscaping and Hardscapping

Description of Project:
This project consisted of 3 level mosque for 1,000 persons, conference Hall, and External fence and Landscaping

Work undertaken by the Co.:
Excavation, Reinforced concrete, Precast installation, Finishing Technical Works, Landscaping and Handicapping

Duration of the Project:
Start June 2000 till 2001 (17 Months)

Value of Company Work:
US $ 1,500,00 as Main Contractor.




Project Name:
Saida Municipal Stadium

Location:
Saida - Lebanon

Client:
Council for Development & Reconstruction (CDR)

Consultant:
LACECO- Bir Hassan- (Tel: 01 826480)

Type of Building Project:
Sports Centers

Type of Works:
Reinforced concrete / Precast concrete / Structural steel works / Mechanical works / Heating, ventilation air conditioning/ Electrical works / Façade works, special finishing / Earth works landscaping / External works (asphalting)

Description of Project:
Sports complex for 22,000 spectators and an underground parking for 850 cars.

Work ndertaken by the Co.:
Works included earthworks, reinforced concrete, precast prestressed concrete, structural steel, tensile fabric, water supply & irrigation, masonry & plastering, doors & windows.

Duration of the Project:
Start May 1999 and end September 2000 (16 months)

Value of Company Work:
US $ 16,000,000 as Prime Sub Contractor











Project Name:
Residences Saint Ephrem

Location:
Beirut – Achrafieh – Adlieh area

Client:
Patrick of Syrian Catholic

Consultant:
Architect Antoine Risk ( Tel: 09 911912 / 03 701409)

Type of Building Project:
Housing

Type of Works:
Reinforced concrete / Mechanical works / Heating, ventilation air conditioning / Electrical works / Façade works, special finishing / Earth works landscaping

Description of Project:
Composed of three buildings for a total of 120 apartments.

Work undertaken by the Co.:
Excavation, Reinforced concrete, Mechanical installation, Electrical works, Finishing works.

Duration of the Project:
24 months from January 1998
Value of Company Work:
US $ 3,857,230 as Main Contractor

Work is under execution






Location:
Beirut- Lebanon

Client:
Khatib and Alamy (Beirut- Cornich al Mazraa –
Al-Ghondol Bldg. Tel : 01 300609)

Consultant:
Khatib and Alamy Associated Engineers

Type of Building Project:
Offices, Public Buildings

Type of Works:
Reinforced Concrete

Description of Project:
This new building is foreseen to host the head office of the consulting group Khatib and Alamy with a car parking.

Work undertaken by the Co.:
Executing the reinforced concrete work using GKN moulds system for slabs and installing all technical incorporation before casting.

Duration of the Project:
Start April 1996 and end February 1997 (11Months)

Value of Company Work:
US$ 856,000 as Prime Subcontractor

 



Project Name: Rehabilitation of Technical Schools
Location: Saida-Nabatieh-Deirelkamar Lebanon
Period of Construction: Started June 1994 and ended October 1994

Description of Project: Rehabilitation of the technical schools with minor modifications.

Description of Works: Cleaning, repainting the walls and facades, additional steel works, concrete repairs.
 

Project Name: LOT No. 256 Ras Beirut
Location: Beirut-Lebanon
Period of Construction: Started March 1993 and ended February 1994

Description of Project: Luxurious Residential Building.

Description of Works: Executing excavations and the concrete works.
 

Project Name: Bissat Warehouse
Location: Saida-Lebanon
Period of Construction: Started September 1992 and ended February 1994

Description of Project: 8000 M2 of warehouse, cold stores, offices, and special apartments.

Description of Works: Excavation, Concrete works, Masonry, Plastering, Painting, Wood Joinery, Aluminum joinery, Steel works, False ceiling, Paving, Technical works.

Project Name: Nijmah 2 building
Location: Saida-Lebanon
Period of Construction: Started May 1992 and ended December 1993

Description of Project: 10,000 M2 residential & commercial building.

Description of Works: Concrete works, Masonry, Plastering, Painting, wood joinery, Aluminum joinery, False ceiling, Paving, & Technical work.

Project Name: Abra 1
Location: Saida-Lebanon
Period of Construction: Started March 1991 and ended April 1992

Description of Project: 5 floor residential building, high quality finishing.

Description of Works: Reinforced concrete / Mechanical works / Heating, ventilation air conditioning / Electrical works.
 

Project Name: Hilalyeh Building
Location: Saida-Lebanon
Period of Construction: Started February 1991 and ended April 1992

Description of Project: High quality residential building.

Description of Works: Reinforced concrete / Mechanical Works / Heating, ventilation & air conditioning / Electrical works.
 

Project Name: Outside Switching Plants 2 (OSP2)
Location: South Lebanon
Period of Construction:
Phase 1: started October 1997 and ended November 1998
Phase 2: started December 1998 and ended March 2000

Description of Project: Rehabilitation and expansion of Outside Switching Plants (1,260,000 lines project)

Description of Works: Excavations, Civil works including manholes, Backfilling Installation of PVC pipes, Asphalt works, Pulling of cables, Termination and jointing of cables & testing.

Value of Company Work:
US$ 23,000,000 as Prime Subcontractor

 

Project Name: Public Swiched Telephone Network
Location: Bekaa-Lebanon
Period of Construction: Started January 1995 and ended September 1997

Description of Project: The purpose of this project is the rehabilitation and expansion of public switched Telephone Networks (1 million lines project)

Description of Works: Excavations, Civil works including manholes, Backfilling Installation of PVC pipes, Asphalt works, Pulling of cable, Termination and jointing of cables & testing.

Value of Company Work:
US$ 20,000,000 as Prime Subcontractor


Project Name: ESCWA Building Substructure Excavation
Location: Beirut Central District-Lebanon
Period of Construction: Started April 1996 and ended August 1996

Description of Project: Excavation works consisted of 180,000 m3 in rock up to a depth of 32m.

Description of Works: Excavation & Hauling of material to Normandy's Dumping Area, executing Rows of Anchors, Shotcreting of Excavation face under neighboring building.

Project Name: Road Asphalting
Location: Saida-Lebanon
Period of Construction: Started January 1993 and ended December 1995

Description of Project: Classified within the frame of rehabilitation and annual maintenance of Saida area roads.

Description of Works: Cleaning the surface of the existing asphalt layer, supply and apply of a new layer of asphalt.
 

Project Name: Saida-Sayneek Bridge - Zahrani Road Works
Location: Zahrani-South Lebanon
Period of Construction: Started March 1994 and ended October 1994

Description of Project: Rehabilitaiton and expansion of the Zahrani road to take the increase in traffic circulation in both direction.

Description of Works: Executing the excavation on both sides of the road, Construction of 2 span post tensioned bridge, total 28m, Laying out sewer, rain water network with manholes, Back filling and compacting hardcore and base course layers & applying 2 layers of asphalt.
 

Project Name: Al Janoub Industrial Park
Location: Bablieh-South Lebanon
Period of Construction: Started in 1999 and is scheduled for completion in 2001

Description of Project: Land Development and Parcelisation of 110 parcels spread over 700 000 sqm.

Description of Works: Road construction-Street Lighting-Water Wells & Water Supply Lines-Sewer Lines &Waste Water Treatment Plant-Power Substation & Lines-Fire Fighting Department.