| The
following is a listing of a selection of projects that ACW
has completed satisfactorily.
Project
Name:
Hill Top Residence
Location:
Talet El-Khayat residential area lot # 1510, Beirut, Lebanon
Client:
جمعية المقاصد الخيرية الإسلامية – M. Ghanem & Abd Ellatif Chamma’ah
Consultant:
Spectrum Engineering Consultants
Project Group:
Turn Key, Luxurious Residential & Commercial Complex
Type of Works:
Major Excavation and Shoring Works, Reinforced Concrete structure, Wood Works, Steel Works, HVAC, Plumbing, electrical, conveying systems, general finishes including paint, tiles, cladding, etc...
Description
of Project:
A luxurious residential complex composed of six residential blocks, 11 stories each with one apartment per floor, underground parking and amenities, external landscaping, and & a modern design commercial centre, with a total of 63,000 m2 of built-up area
Estimated value of Works:
$ 55,000,000. US
Duration of project:
3 years
Work
is under execution
|
|
Project
Name:
Nova Towers
Location:
Mme Curie Street, Koreitem on Lots 1068 & 1069, Beirut, Lebanon
Client:
Mohammad Ghanem El Chamma'ah - Shatilla Family
Consultant:
Spectrum Engineering Consultants
Project Group:
Luxurious Residential Building
Type of Works:
Minor excavation, demolition, concrete works, masonry, stone cladding, Plumbing, heating ventilation, and Air conditioning, Tiling, false ceiling and general finishes.
Description
of Project:
Unique independent Twin Towers consisting of; A ground floor, 22 stories, and five underground basements for car parks, technical rooms, and amenities.
Duration of the Project:
24 months Works Started on December 2006, Expected Date of Handing over December 2009.
Work
is under execution
|
|
Project
Name:
Vega Residence
Location:
Old Ain Mreisseh Street, on Lot 364, Beirut, Lebanon
Client:
Mohammad Ghanem El Chamma'ah - Moumneh Family
Consultant:
Spectrum Engineering Consultants
Project Group:
Luxurious Residential Building
Description
of Project:
Unique building consisting of; A ground floor, 13 stories, and two underground basements for car parks, technical rooms, and amenities.
Duration of the Project:
24 months Works Started on December 2006, Expected Date of Handing over December 2009.
Work
is under execution
|
|
Project
Name:
Traffic Management Centre - TMC
Location:
Dora District, Nahr Street, Beirut, Lebanon
Client:
Council for Development & Reconstruction
Consultant:
Team-IDE
Project Group:
New Building - Governmental Building
Type of Works:
Minor excavation, demolition, concrete works, masonry, stone cladding, Plumbing, heating ventilation, and Air conditioning, Tiling, false ceiling and general finishes.
Description
of Project:
Five Story Building for offices and control rooms including auditorium and one basement for car park, to accommodate the control centre of all traffic management systems in Beirut.
Work undertaken by the Co.:
Minor excavation, demolition, concrete works, masonry, stone cladding, Plumbing, heating ventilation, and Air conditioning, Tiling, false ceiling and general finishes.
Duration of the Project:
18 months Works Started May 2006, Expected date of Handing over November 2007.
(Project Currently under execution)
Value of Company Work:
Approximately $ 5,000,000 US (Five Million US Dollars)
|
|
Project
Name:
Baalchmieh Private Residence
Location:
Baalchmieh, Lebanon
Client:
Abdel Rahman Al Shaye
Consultant:
Al Diar - IDEP
Project Group:
Restoration and New Building
Type of Works:
Restoration, excavation, demolition, concrete works, masonry, stone cladding, Plumbing, heating ventilation, and Air conditioning, Tiling, false ceiling and general finishes, swimming pool, and Landscaping.
Description
of Project:
Demolition of areas in the old building, restoration of the old building, and the construction of an annex villa, gymnasium, swimming pool, retaining walls, fence, boiler room, and landscaping.
Works Undertaken by Company:
Minor excavation, demolition, concrete works, masonry, stone cladding, Tiling, false ceiling and general finishes.
Managing and coordinating plumbing, heating ventilation, and Air conditioning,
Duration of the Project:
24 months Works Started July 2005, Expected date of Handing over July 2007.
Value of Company Works
Approximately $ 3,500,000 US (Three Million Five Hundred Thousand US Dollars)
|
|
Project
Name:
Beirut Arab University Debbieh Complex
Location:
Debbieh – Lebanon
Client:
Beirut Arab University
Consultant:
Said El – Jazairi & Partners,
Beirut
(Tel:01-345128)
Type of Building Project:
Educational Complex
Type of Works:
Reinforced Concrete/ Precast concrete/ Structural
steel works/ Mechanical Works/ Heating, ventilation
air conditioning / Electrical works/ Façade
works, special finishing/ Earth Works, landscaping
/ External works (asphalting)
Description of Project:
Complex Consisting of 2 teaching buildings,
One administration, and 3 teachers and students housing
buildings. Total build up area is approximately 27,000m2.
Work undertaken by the Co.:
Works included earthworks, reinforced concrete,
precast prestressed concrete, structural steel, water
supply & irrigation, masonry 7 plastering, doors
& windows.
Duration of the Project:
Start February 2003- under construction
(24 months)
Value of Company Work:
US $ 7,500,000 as Main Contractor.
|


|
Project
Name:
Park Avenue – LONA 1
Location:
Beirut Central District (Solidere) - Lebanon
Client:
Confidential Client.
Consultant:
Al DIAR
Project Group:
New Building
Type of Works:
Excavation, Waterproofing, demolition, & concrete works.
Description
of Project:
Private Residence.
Work undertaken by the Co.:
Excavation, Waterproofing, & concrete works.
Duration of the Project:
15 months Works Started July 2005, Date of Handing over September 2006.
Value of Company Work:
Approximately $ 1,500,000 US (One Million Five Hundred Thousand US Dollars)
Work
is completed
|
|
Project
Name:
Naccache – Rabieh and Dick El Mehdi
Interchanges
Location:
Rabieh – Metn
Client:
Council for Development & Reconstruction
(CDR)
Consultant:
ETEC, Clemencau, Beirut
Project Group:
General Road Works: 4 lane road
Type of Works:
Earthworks / Asphalt works / Concrete bridges
/ Utilities and services / Road markings and street
furniture / Side walks & curbstones works.
Description
of Project:
The project consists of an underground
4 lane road tunnel of approximately 210 m long and
includes 800 m of retaining walls.
Work undertaken by the Co.:
The works involved excavation in firm
rock formation, retaining walls, underground utilities,
box section tunnel (2 way) in reinforced concrete,
asphalt works and road marking.
Duration of the Project:
Start December 1999 and end November 2000
(11 Months)
Value of Company Work:
US $ 3,750,000 as Main Contractor
Work
is under execution
|
|
Project
Name:
Metropolitan City Center Excavation &
Shoring Works
Location:
Beirut – Lebanon
Client:
Al- Habtoor Properties (Jamhour, Tel: 05-920950)
Consultant:
Conser Consulting Engineers (Beirut, Tel:01-
737825
Project Group: General Civil Works:
Excavation & Shoring Works.
Type of Works:
General Works/ Anchorage works/ Shotcreting
Works
Description of Project:
Excavation works consist of 400,000m3 with
depth of 28m, 4,000m of Piles up to 32m deep, 26,000m
of Anchors up to 26m long
Work undertaken by the Co.:
Excavation & carting away of material
carting away drilling piles, executing Rows of Anchors,
Shotcreting of Excavation face under neighbouring
building and reads.
Duration of the Project:
Start August 2002 and end July 2003 (11
month)
Value of Company Work:
US $ 3,750,000 as Main Contractor
|
|
Project
Name:
Traffic Management of Saida Eastern Boulevard
Location:
Saida
Client:
Council for Development and Reconstruction
(CDR)
Consultant:
Dar Al Handasah- Shair and Partners.
Project Group:
Road Works
Type of Works:
Earth Works, Sub- base and Base Course,
Bituminous Pavement, Reinforced Concrete and Steel
Structure, Incidental Construction, street Lighting
and Electrical Installations, Landscaping and Irrigation
Description
of Project:
The works comprises the constructions and
completion of 1km dual carriage- way parallel to the
eastern boulevard in Saida, inside railway premise
and between Sabbagh and Al- Murjan intersect Each
carriage way consists of 1 Lane (3.5m) per direction
and 1m shoulder. Also the project includes the upgrading
of traffic flow at Eliya and Al – Arabi Intersections.
Work
undertaken by the Co.:
The works involved excavation, Sub base
and base course, Bituminous construction concrete
protection for Electrical substation, curbstone, Side
Walk, Road Signs, Road Marking, Traffic signals, Landscaping
and Irrigation, and all other related works necessary
for the completion of the project.
Duration
of the Project:
6 Months
Value of Company Work:
$ 732,800
|
 |
Project
Name:
Imam El Ousaii Islamic University
Location:
Saida – Lebanon
Client:
Bir Wal Ihsan Entailment
Consultant:
Said Jazairi
Type of Building
Project:
Buildings
Type of Works:
Reinforced Concrete 12,000 m3, Escavation
25,000m3
Description of Project:
Construction of one University Building
and A Mosque Overall approximately 15,000m2.
Work
undertaken by the Co.:
Excavation works and Reinforced Concrete
Duration of the Project:
Start October 2003 till 2004
Value of Company Work:
US $ 1,600,00 as Main Contractor.
|
 |
|
Project
Name:
Martyrs Mosque
Location:
Saida – Lebanon
Client:
Confidential Client
Consultant:
Amin Bizri Architect
Type of Building
Project:
Buildings
Type of Works:
Reinforced Concrete/ Precast prestressed,
plumbing, HVAC, Electrical, External lighting, Landscaping
and Hardscapping
Description
of Project:
This project consisted of 3 level mosque
for 1,000 persons, conference Hall, and External fence
and Landscaping
Work undertaken
by the Co.:
Excavation, Reinforced concrete, Precast
installation, Finishing Technical Works, Landscaping
and Handicapping
Duration
of the Project:
Start June 2000 till 2001 (17 Months)
Value of Company Work:
US $ 1,500,00 as Main Contractor.
|

|
Project
Name:
Saida Municipal Stadium
Location:
Saida - Lebanon
Client:
Council for Development & Reconstruction
(CDR)
Consultant:
LACECO- Bir Hassan- (Tel: 01 826480)
Type
of Building Project:
Sports Centers
Type of Works:
Reinforced concrete / Precast concrete /
Structural steel works / Mechanical works / Heating,
ventilation air conditioning/ Electrical works / Façade
works, special finishing / Earth works landscaping
/ External works (asphalting)
Description
of Project:
Sports complex for 22,000 spectators and
an underground parking for 850 cars.
Work ndertaken
by the Co.:
Works included earthworks, reinforced concrete,
precast prestressed concrete, structural steel, tensile
fabric, water supply & irrigation, masonry &
plastering, doors & windows.
Duration of
the Project:
Start May 1999 and end September 2000 (16
months)
Value of Company
Work:
US $ 16,000,000 as Prime Sub Contractor
|



|
Project
Name:
Residences Saint Ephrem
Location:
Beirut – Achrafieh – Adlieh
area
Client:
Patrick of Syrian Catholic
Consultant:
Architect Antoine Risk ( Tel: 09 911912
/ 03 701409)
Type
of Building Project:
Housing
Type of Works:
Reinforced concrete / Mechanical works /
Heating, ventilation air conditioning / Electrical
works / Façade works, special finishing / Earth
works landscaping
Description
of Project:
Composed of three buildings for a total
of 120 apartments.
Work
undertaken by the Co.:
Excavation, Reinforced concrete, Mechanical
installation, Electrical works, Finishing works.
Duration of the Project:
24 months from January 1998
Value of Company Work:
US $ 3,857,230 as Main Contractor
Work
is under execution
|


|
Location:
Beirut- Lebanon
Client:
Khatib and Alamy (Beirut- Cornich al Mazraa
–
Al-Ghondol Bldg. Tel : 01 300609) Consultant:
Khatib and Alamy Associated Engineers
Type of Building Project:
Offices, Public Buildings
Type of Works:
Reinforced Concrete
Description of Project:
This new building is foreseen to host the
head office of the consulting group Khatib and Alamy
with a car parking.
Work
undertaken by the Co.:
Executing the reinforced concrete work using
GKN moulds system for slabs and installing all technical
incorporation before casting.
Duration of the Project:
Start April 1996 and end February 1997 (11Months)
Value of Company Work:
US$ 856,000 as Prime Subcontractor
|

|
Project
Name: Rehabilitation of Technical Schools
Location: Saida-Nabatieh-Deirelkamar Lebanon
Period of Construction: Started June 1994 and
ended October 1994
Description of Project: Rehabilitation of the
technical schools with minor modifications.
Description of Works: Cleaning, repainting the
walls and facades, additional steel works, concrete
repairs.
|
|
Project
Name: LOT No. 256 Ras Beirut
Location: Beirut-Lebanon
Period of Construction: Started March 1993 and
ended February 1994
Description of Project: Luxurious Residential
Building.
Description of Works: Executing excavations and
the concrete works.
|
|
Project
Name: Bissat Warehouse
Location: Saida-Lebanon
Period of Construction: Started September 1992
and ended February 1994
Description of Project: 8000 M2 of warehouse,
cold stores, offices, and special apartments.
Description of Works: Excavation, Concrete works,
Masonry, Plastering, Painting, Wood Joinery, Aluminum
joinery, Steel works, False ceiling, Paving, Technical
works.
|
 |
Project
Name: Nijmah 2 building
Location: Saida-Lebanon
Period of Construction: Started May 1992 and
ended December 1993
Description of Project: 10,000 M2 residential
& commercial building.
Description of Works: Concrete works, Masonry,
Plastering, Painting, wood joinery, Aluminum joinery,
False ceiling, Paving, & Technical work.
|
 |
Project
Name: Abra 1
Location: Saida-Lebanon
Period of Construction: Started March 1991 and
ended April 1992
Description of Project: 5 floor residential
building, high quality finishing.
Description of Works: Reinforced concrete / Mechanical
works / Heating, ventilation air conditioning / Electrical
works.
|
|
Project
Name: Hilalyeh Building
Location: Saida-Lebanon
Period of Construction: Started February 1991
and ended April 1992
Description of Project: High quality residential
building.
Description of Works: Reinforced concrete / Mechanical
Works / Heating, ventilation & air conditioning / Electrical
works.
|
|
Project
Name: Outside Switching Plants 2 (OSP2)
Location: South Lebanon
Period of Construction:
Phase 1: started October 1997 and ended November 1998
Phase 2: started December 1998 and ended March 2000
Description of Project: Rehabilitation and expansion
of Outside Switching Plants (1,260,000 lines project)
Description of Works: Excavations, Civil works
including manholes, Backfilling Installation of PVC
pipes, Asphalt works, Pulling of cables, Termination
and jointing of cables & testing.
Value of Company Work:
US$ 23,000,000 as Prime Subcontractor
|
|
Project
Name: Public Swiched Telephone Network
Location: Bekaa-Lebanon
Period of Construction: Started January 1995
and ended September 1997
Description of Project: The purpose of this
project is the rehabilitation and expansion of public
switched Telephone Networks (1 million lines project)
Description of Works: Excavations, Civil works
including manholes, Backfilling Installation of PVC
pipes, Asphalt works, Pulling of cable, Termination
and jointing of cables & testing.
Value of Company Work:
US$ 20,000,000 as Prime Subcontractor
|
 |
Project
Name: ESCWA Building Substructure Excavation
Location: Beirut Central District-Lebanon
Period of Construction: Started April 1996 and
ended August 1996
Description of Project: Excavation works consisted
of 180,000 m3 in rock up to a depth of 32m.
Description of Works: Excavation & Hauling of
material to Normandy's Dumping Area, executing Rows
of Anchors, Shotcreting of Excavation face under neighboring
building.
|
 |
Project
Name: Road Asphalting
Location: Saida-Lebanon
Period of Construction: Started January 1993
and ended December 1995
Description of Project: Classified within the
frame of rehabilitation and annual maintenance of Saida
area roads.
Description of Works: Cleaning the surface of
the existing asphalt layer, supply and apply of a new
layer of asphalt.
|
|
Project
Name: Saida-Sayneek Bridge - Zahrani Road Works
Location: Zahrani-South Lebanon
Period of Construction: Started March 1994 and
ended October 1994
Description of Project: Rehabilitaiton and expansion
of the Zahrani road to take the increase in traffic
circulation in both direction.
Description of Works: Executing the excavation
on both sides of the road, Construction of 2 span post
tensioned bridge, total 28m, Laying out sewer, rain
water network with manholes, Back filling and compacting
hardcore and base course layers & applying 2 layers
of asphalt.
|
|
Project
Name: Al Janoub Industrial Park
Location: Bablieh-South Lebanon
Period of Construction: Started in 1999 and is
scheduled for completion in 2001
Description of Project: Land Development and
Parcelisation of 110 parcels spread over 700 000 sqm.
Description of Works: Road construction-Street
Lighting-Water Wells & Water Supply Lines-Sewer Lines
&Waste Water Treatment Plant-Power Substation & Lines-Fire
Fighting Department.
|
 |
|